Pages

Monday, January 2, 2012

November 2011

BOOTLEGGER is put away for the winter and the endless list of projects must now resume.

·         Replace cabin sole (started 01/2012)

·         Rebuild hydraulics, with exception of backstay

·         Re-stitch horseshoe holders

·         Buy and install GPIRB (completed 12/2011)

·         Buy and install VHF/AIS and remote in cockpit

·         Install shelves in storage behind stove and icebox

·         Replace spinnaker pole end

·         Replace all bulbs with LEDs

·         Replace roller furling cage

·         Replace 3 DC panel switches

·         Find leak in fresh water system

·         Replace/change oil, antifreeze, all filters, and alternator belt

·         Replace hose clamps below waterline

·         Replace automatic bilge pump switch

·         Replace two Ockam LCDs

·         Replace Treadmaster at stem

·         Clean and grease winches

·         Install lazyjacks

·         Re-bed handrails and toerails

·         Replace chart storage and head zippers

·         Replace aft lifelines